Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 19 results ...

Abou-Zeid, A M K (1993) Data flow identification to support project automation/integration and productivity, Unpublished PhD Thesis, , The University of Wisconsin - Madison.

Al-Fares, M A (1995) On the development of an integrated system for the automation of on-site reinforced concrete construction, Unpublished PhD Thesis, , The University of Wisconsin - Madison.

Ammar, A I (2001) Profitability of electrical contractors using financial and economical data: The effect of company's size, Unpublished PhD Thesis, , The University of Wisconsin - Madison.

Choi, J (2003) Strategic motives underlying M and A transactions in the United States public construction industry, Unpublished PhD Thesis, , The University of Wisconsin - Madison.

Choi, K (2008) Applications of its archived data for improved highway planning and design, Unpublished PhD Thesis, , The University of Wisconsin - Madison.

Huang, C-N (2003) Time study on two-echelon supply chain for steel framing construction: Field investigation and networking model simulation, Unpublished PhD Thesis, , The University of Wisconsin - Madison.

Ibrahim, M W W (2018) Improving project performance by mitigating out-of-sequence work and assessing construction readiness, Unpublished PhD Thesis, , The University of Wisconsin - Madison.

Jang, H (2002) Construction material logistics: Project manager level of satisfaction and facilities layout planning, Unpublished PhD Thesis, , The University of Wisconsin - Madison.

  • Type: Thesis
  • Keywords: continuous improvement; personnel; construction project; high rise; logistics; material handling; heuristic; productivity; construction site; project manager; interview
  • ISBN/ISSN:
  • URL: https://www.proquest.com/docview/305477956
  • Abstract:
    Construction management researchers have only recently highlighted the relationship between the contractors and the ultimate customers. To improve the understanding of the significance of customer satisfaction regarding construction logistics tasks, a pilot study has been undertaken. Customer satisfaction and continuous improvement are the fundamental goals of construction logistics tasks. Therefore the logistics manager who coordinates these operations with all parties to a contract is very important to the successful completion of a construction project. This thesis examines how construction logistics affect a senior project manager's level of satisfaction and also defines through the use of a survey which logistics factors correlate the most with customer satisfaction. Two hundred twenty-three experienced managers provided valuable data to the study. Five important factors relating to satisfaction were found through interviews with logistics managers and a literature review. They are personnel, material flow, schedule adherence, contractor's organization, and information flow. The study results suggest that material flow and information flow are worthy of the most attention. Poor usage of space at construction sites is one of the leading causes of decrease in productivity in the construction industry; however, it is both preventable and manageable. The most commonly used method for space management in the industry is development of site plans. These plans outline how to manage material deliveries, staging areas, and crane locations for construction sites in suburban area but not in congested urban areas. This study focuses on how to efficiently manage space for construction facilities on high-rise buildings in congested urban areas where normally space for facilities around a building footprint is not available. The limitations of available horizontal space create a need to explore vertical expansion of facilities. This raises new aspects of vertical material handling and flow that need to be considered in the facility design problem. The construction facilities layout plan method provides layout planners with a valuable technique to develop efficient sequences of work that optimally defines how to efficiently utilize the construction facilities and minimize the travel of specific facilities effort on multiple-floor buildings. In this thesis, a genetic algorithm-based heuristic will be presented for generating block layouts for multiple-floor layout problems.

Kang, M M K (2014) Development of an expert system for sustainable pavement preservation strategies (es2p2s), Unpublished PhD Thesis, , The University of Wisconsin - Madison.

Kim, S-K (2001) Toward a framework for an intelligent earthwork system (ies), Unpublished PhD Thesis, , The University of Wisconsin - Madison.

Koo, K-J (2000) Organizational program management for multiple maintenance projects under multi-trade capacity constraints, Unpublished PhD Thesis, , The University of Wisconsin - Madison.

Lee, J C (2010) Evaluating the sustainability of construction with recycled materials, Unpublished PhD Thesis, , The University of Wisconsin - Madison.

Lee, S (2000) Spatial model and decentralized path planning for construction automation, Unpublished PhD Thesis, , The University of Wisconsin - Madison.

Lukito, P K (2000) A framework for environmental monitoring infrastructure investment planning in developing areas, Unpublished PhD Thesis, , The University of Wisconsin - Madison.

Rungjang, K (2013) Public investment for developing port facilities within competitive market, Unpublished PhD Thesis, , The University of Wisconsin - Madison.

Schwab, A (2000) Management practices in short-term network organizations: The performance impact of the shadow of the future and psychological contracts in the United States movie industry, 1931--1940, Unpublished PhD Thesis, , The University of Wisconsin - Madison.

Shr, J-F (1999) Model development for cost-plus-time bidding applied to Florida department of transportation highway construction, Unpublished PhD Thesis, , The University of Wisconsin - Madison.

Sullivan, K T (2004) Quantification of the cumulative impact of change orders on sheet metal labor productivity, Unpublished PhD Thesis, , The University of Wisconsin - Madison.

Taha, M A-E (1994) Applying distributed artificial intelligence to the prequalification of construction contractors, Unpublished PhD Thesis, , The University of Wisconsin - Madison.